Call us on telephone icon 01226 785 722

News

Glastonbury 1
16th September 2016

Glastonbury – 324mm Lost Steel

A 30m crossing of 324mm lost steel casings were installed by our customer at Glastonbury. An mts Perforator PBA85 guided auger boring system and relevant tooling were hired along with our operator to complete the project. The equipment will now be returned and serviced ready for the next project.

Images | Select to enlarge

Share



Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT