Call us on telephone icon 01226 785 722

Pilot Rods & Steering Heads

steering head
steering head

Using the pilot rods, steering head and the Perforcam optical-electronic navigation system you can complete your pilot bores with pinpoint accuracy. Depending on the ground conditions encountered on site you should always use double wall pilot rods to ensure use of BMA pump & tank mixing systems, along with various aggressions of steering head.

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT