Hire project successfully completed in Peterborough which included one of our experienced operators. The project consisted of installing two 25m crossings of DN600 concrete. Our mts Perforator PBA150 thrust boring machine and tooling was hired to complete the project successfully and in the time frame required for the customer. The equipment is now loaded to return to the yard in Barnsley.